{"id":2870,"date":"2024-02-02T09:16:43","date_gmt":"2024-02-02T08:16:43","guid":{"rendered":"https:\/\/dev.klimapaktfirbetriber.lu\/?post_type=mesures&#038;p=2870"},"modified":"2025-06-30T10:13:04","modified_gmt":"2025-06-30T08:13:04","slug":"hall-and-workshop-heating","status":"publish","type":"mesures","link":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/measures\/hall-and-workshop-heating\/","title":{"rendered":"Hall and workshop heating"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Adaptations for heating halls and workshops<\/h2>\n\n\n\n<p>Company halls and workshops, often characterised by large open spaces and high ceilings, present a particular challenge when it comes to installing an energy-efficient, targeted heating system. The ideal heating system for halls must therefore be able to heat the different work areas individually and produce heat at the right height.<\/p>\n\n\n\n<p>Halls and workshops have specific heating requirements due to their size and use. It is therefore essential to carry out a thorough requirements analysis before installing a new heating system.<\/p>\n\n\n\n<!--more-->\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Definition of heating requirements for halls and workshops<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Analysis of the current situation<\/h3>\n\n\n\n<p>Determine the parameters of the existing installation, e.g. age, general condition, centralised or decentralised system, air exchange, energy consumption and associated costs, etc.:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>List planned renovation work (insulation, extension, replacement of doors and\/or windows, etc.)<\/li>\n\n\n\n<li>Detail the use of the building, e.g. storage hall or workshop, etc.<\/li>\n\n\n\n<li>Evaluate the heating requirements of the hall\/workshop and determine whether the needs should be considered as a whole or only by zone<\/li>\n\n\n\n<li>Identify physical workspaces and office-type workstations<\/li>\n\n\n\n<li>Is the heating system centralised or decentralised?<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>Waste heat recovery<\/strong><\/strong><\/h3>\n\n\n\n<p>Identify potential sources of heat that could contribute to space heating, e.g. industrial heat (furnaces, steam, etc.), ventilation systems, compressors (compressed air system), etc.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Durability of the heating system<\/h3>\n\n\n\n<p>Plan heating production using renewable energies, e.g. heat pumps, solar thermal heat, etc.<\/p>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading has-green-color has-text-color has-link-color wp-elements-3d33b47a85e7ef2e696e94fc009d2342\">Optimisation of existing heating systems in halls and workshops<\/h3>\n\n\n\n<p><strong><strong>Simple measures can help save energy in existing heating systems:<\/strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Adapt operating hours to the operating hours of the premises<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Check that temperatures are set to the appropriate level for current needs<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Install a heat recovery system on the ventilation system<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Minimise heat loss, e.g. by reducing the time windows and doors are open during the heating or cooling season<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Install intelligent thermostats for easy temperature control<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Insulate heating pipes outside heating zones and those rising to the ceiling<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Check that the thermostats are working properly<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Close and insulate unused and functional openings in the building<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Check and replace seals (doors, gates)<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Separate storage areas from work areas and reduce the temperature in storage areas<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Identifying the solution and checking the feasibility of the project to change the heating system<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Definition of the solution<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Based on the requirements analysis, define the solution in collaboration with a competent <a href=\"https:\/\/www.oai.lu\/fr\/9\/topmenu\/annuaire-membres\/\" target=\"_blank\" rel=\"noreferrer noopener\"><u>engineering office<\/u><\/a>.<\/li>\n\n\n\n<li>In addition to the main heat production unit, consider recovering waste heat and combining the unit with another technology, such as solar thermal heating.<\/li>\n\n\n\n<li>Heat production:\n<ul class=\"wp-block-list\">\n<li>Central or decentralised gas, oil, wood or electric (infrared, heat pump) heating<\/li>\n\n\n\n<li>Heat distribution using heating water or direct air heating<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Heat distribution:<\/li>\n\n\n\n<li>Warm air heating: can be connected to central heating or heating with decentralised units, usually fixed to the ceiling. New systems make it possible to install decentralised heat pumps for warm air heating.<\/li>\n\n\n\n<li>Infrared heating (suspended radiant panels): the heating panels can be installed where the need for heat is greatest (e.g. workstations in a storage hall), allowing zone heating. Low-temperature systems using heating water or electric systems are preferable, as they are more efficient than warm air heating.<\/li>\n\n\n\n<li>Underfloor heating using low-temperature central heating, ideal with a heat pump. Zone heating is possible with different heating circuits laid in the floor, but the installation costs are high.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Verification of the proposed installation or modification of the heating system in a hall or workshop with regard to operating permits<\/h3>\n\n\n\n<p>When adapting existing facilities, and particularly when setting up new facilities, check the <a href=\"https:\/\/environnement.public.lu\/fr\/emweltprozeduren\/Autorisations\/Etablissements_classes\/nomenclature-commodo.html\" target=\"_blank\" rel=\"noreferrer noopener\"><u>nomenclature for classified establishments<\/u><\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Drawing up specifications and requesting tenders for the heating installation project<\/h3>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Subsidy application<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>Government subsidies<\/strong><\/strong><\/h3>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-green-color has-text-color has-link-color wp-elements-84beb9f3956b31b65474c09246582de8\"><strong>Attention: incentive effect to be complied with when applying for subsidies (state or otherwise) and subject to meeting the eligibility conditions.<\/strong><\/p>\n\n\n\n<p>In order to respect the &#8220;incentive effect&#8221;, no binding commitment (signing a quotation; paying a deposit) may be made BEFORE submitting the application file or receiving the agreement in principle from the State or the electricity and natural gas supplier following a subsidy application.<\/p>\n<\/div><\/div>\n\n\n\n<p><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4.html\" target=\"_blank\" rel=\"noreferrer noopener\"><u><strong>Fit 4 Sustainability&#8221; programme:<\/strong><\/u><\/a><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The &#8220;Fit 4 Sustainability&#8221; programme provides co-financing for an environmental audit and action plan on one or more topics chosen by the company (energy, greenhouse gases, waste, water, etc.)<\/li>\n\n\n\n<li>Subsidies of up to 50&nbsp;%, 60&nbsp;% and 70&nbsp;% of the fees for carrying out an environmental study (energy audit and\/or carbon footprint) + detailed, costed action plan to reduce consumption\/GHGs (greenhouse gases) (medium- and long-term investment, ROI, etc.) &#8211; open to SMEs and large companies (except those required to carry out a statutory audit)<\/li>\n\n\n\n<li>Any questions? <a href=\"mailto:fit4sustainability@luxinnovation.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Luxinnovation<\/u><\/a><\/li>\n<\/ul>\n\n\n\n<p><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-sme-packages\/soutien-pme\/sme-packages-sustainability.html\" target=\"_blank\" rel=\"noreferrer noopener\"><u><strong>SME Packages &#8211; Sustainability<\/strong><\/u><\/a><strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Financial Aid for small and medium-sized enterprises covering up to 70% of eligible costs for the implementation of a project aimed at reducing the environmental impact. The eligible project budget must be in a range from 3.000 \u20ac to 25.000 \u20ac excl. VAT.<\/li>\n\n\n\n<li>For more information:\n<ul class=\"wp-block-list\">\n<li><a href=\"mailto:ehandwierk@cdm.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Chambre des M\u00e9tiers<\/u><\/a>&nbsp;for craft companies<\/li>\n\n\n\n<li><a href=\"mailto:sustainability@cc.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Chamber of Commerce<\/u><\/a> for businesses in the non-craft sectors<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/aides-environnement\/industrie-services\/aide-protec-environnement.html\" target=\"_blank\" rel=\"noreferrer noopener\"><u><strong>Environmental protection scheme &#8211; Investment aid for the protection of the environment<\/strong><\/u><\/a><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Verification of company eligibility and costs: <a href=\"https:\/\/guichet.public.lu\/en\/citoyens\/organismes\/organismes_entreprises\/ministere-economie\/direction-recherche-innov.html\" target=\"_blank\" rel=\"noopener\">General Directorate &#8211; Industry, new Technology and Research<\/a><\/li>\n\n\n\n<li>Support in drawing up the subsidy application file prior to submission to the Ministry of the Economy<\/li>\n\n\n\n<li>Any questions? <a href=\"mailto:aides@luxinnovation.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Luxinnovation<\/u><\/a><\/li>\n\n\n\n<li>More information and recommendations for companies on investing in the environment are available in the <a href=\"https:\/\/luxinnovation.lu\/getmedia\/ef53005c-714b-47fe-9e93-4ded9ec74387\/guide-env-simplifie-meco-lxi-20221020-(2).pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Guide simplifi\u00e9 pour les entreprises<\/u><\/a> (Simplified Guide for Companies)<\/li>\n<\/ul>\n\n\n\n<p><strong>SME aid scheme &#8211; <\/strong><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-pme\/aides-generales-pme\/aide-investissements-divers.html\" target=\"_blank\" rel=\"noreferrer noopener\"><u><strong>Aid for miscellaneous investments<\/strong><\/u><\/a><\/p>\n\n\n\n<p>Subsidies for small and medium-sized businesses, up to 10&nbsp;% or 20&nbsp;% of the amount of miscellaneous investments aimed at promoting the modernisation and competitiveness of the Luxembourg economy.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Verification of company eligibility and costs: <a href=\"mailto:info.aide.pme@eco.etat.lu\">Ministry of the Economy<\/a>&nbsp;(Department for Support to SMEs)<\/li>\n\n\n\n<li>Any questions?<\/li>\n\n\n\n<li><a href=\"mailto:subsides@houseofentrepreneurship.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>House of Entrepreneurship<\/u><\/a>&nbsp;of the Chamber of Commerce<\/li>\n\n\n\n<li><a href=\"mailto:contact@cdm.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Chambre des M\u00e9tiers (Chamber of Skilled Trades and Crafts)<\/u><\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\">N.B. State subsidies cannot be combined for the same project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Application for subsidies from electricity and natural gas suppliers<\/strong><\/h3>\n\n\n\n<p>Since 2015, natural gas and electricity suppliers have been required to make energy savings for consumers under the obligation scheme. Since then, energy suppliers have been offering support and advice, as well as subsidy programmes for consumers to implement energy efficiency measures.<\/p>\n\n\n\n<p>The following suppliers offer this service for companies:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.enoprimes.lu\/fr\/entreprises\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.enoprimes.lu\/fr\/entreprises\/\" rel=\"noreferrer noopener\">Enoprimes Enovos + SUDenergie<\/a><\/li>\n\n\n\n<li><a href=\"mailto:ps@sudenergie.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>SUDenergie<\/u><\/a><\/li>\n\n\n\n<li><a href=\"mailto:subvention@sudstroum.lu\" target=\"_blank\" rel=\"noreferrer noopener\"><u>Sudstroum<\/u><\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\">N.B. Supplier subsidies can be combined with any state subsidies for the same project.<\/p>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>After completion of the works<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>Every heating system requires maintenance<\/strong><\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Follow the system installer&#8217;s instructions<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Designate a person responsible for checking that the system is operating correctly<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Check operation and temperature requirements once a year<\/li>\n<\/ul>\n","protected":false},"featured_media":2868,"parent":0,"template":"","secteur":[129,142,76,77,132,68,62,72,71,73],"thematique":[78],"application":[103,104,106],"class_list":["post-2870","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-boulanger-en","secteur-food-trade","secteur-agriculture-viticulture","secteur-aid-and-care-sector","secteur-carpentry","secteur-construction-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-energie-en","application-building","application-heating","application-ventilation-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/2870","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":12,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/2870\/revisions"}],"predecessor-version":[{"id":1388510,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/2870\/revisions\/1388510"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media\/2868"}],"wp:attachment":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media?parent=2870"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/secteur?post=2870"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/thematique?post=2870"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/application?post=2870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}