{"id":1591,"date":"2023-04-27T11:30:28","date_gmt":"2023-04-27T09:30:28","guid":{"rendered":"https:\/\/dev.klimapaktfirbetriber.lu\/mesures\/installer-une-infrastructure-de-charge-pour-vehicules-electriques-en-entreprise\/"},"modified":"2025-08-12T09:11:53","modified_gmt":"2025-08-12T07:11:53","slug":"charging-infrastructure-for-ev-on-company-premises","status":"publish","type":"mesures","link":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/measures\/charging-infrastructure-for-ev-on-company-premises\/","title":{"rendered":"Installing a charging infrastructure for electric vehicles on company premises"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Electric mobility, a key element in decarbonising your business<\/h2>\n\n\n\n<p>Electric cars are part of the solution to successfully decarbonising your company&#8217;s vehicle fleet. It is also essential to set up a suitable charging infrastructure within the company so that the logistics of charging can be managed internally. For greater autonomy, the system can be combined with <a href=\"https:\/\/dev.klimapaktfirbetriber.lu\/en\/simplified-measures\/installing-photovoltaic-panels-on-company-roofs\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/dev.klimapaktfirbetriber.lu\/en\/simplified-measures\/installing-photovoltaic-panels-on-company-roofs\/\" rel=\"noreferrer noopener\">a solar power installation.<\/a><\/p>\n\n\n\n<!--more-->\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Definition of the company&#8217;s mobility requirements<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Analysis of requirements<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Total number of electric cars (current and future needs)<\/li>\n\n\n\n<li>Typical parking time and charging autonomy required during this period<\/li>\n\n\n\n<li>Number of vehicles that need to charge simultaneously (charge management)<\/li>\n\n\n\n<li>Charging capacity (accelerated charging (&lt; 22kW) and\/or ultra-fast charging (DC))<\/li>\n\n\n\n<li>Technical requirements for charging points (<a href=\"https:\/\/bornes.klima-agence.lu\/en\" target=\"_blank\" rel=\"noreferrer noopener\">Charging comparison tool<\/a>)<\/li>\n\n\n\n<li>Billing system and consumption monitoring<\/li>\n\n\n\n<li><a href=\"https:\/\/www.klima-agence.lu\/en\/practical-examples-planning-charging-infrastructure\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.klima-agence.lu\/fr\/exemples-pratiques-pour-la-planification-dune-infrastructure-de-charge\" rel=\"noreferrer noopener\">Concrete examples for planning a charging infrastructure<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/sia2060online.ch\/home.11fr.html\" data-type=\"link\" data-id=\"https:\/\/sia2060online.ch\/home.11fr.html\" target=\"_blank\" rel=\"noopener\">Help with needs analysis: simplified planning calculator<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.consilium.europa.eu\/en\/infographics\/fit-for-55-afir-alternative-fuels-infrastructure-regulation\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.consilium.europa.eu\/en\/infographics\/fit-for-55-afir-alternative-fuels-infrastructure-regulation\/\" rel=\"noreferrer noopener\">AFIR compliance<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\"><em>The new AFIR regulations (Alternative Fuels Infrastructure Regulation) have been in effect since the 13th of April 2024. This mandates all new charging stations, among other things, to accept payment via credit card or other electronic payment methods, so that users can charge their car without needing the provider&#8217;s specific charging card. Additionally, users must be transparently informed about the price. This also applies to stations that businesses provide for their visitors. <a href=\"https:\/\/www.consilium.europa.eu\/en\/infographics\/fit-for-55-afir-alternative-fuels-infrastructure-regulation\/\" data-type=\"link\" data-id=\"https:\/\/www.consilium.europa.eu\/en\/infographics\/fit-for-55-afir-alternative-fuels-infrastructure-regulation\/\" target=\"_blank\" rel=\"noreferrer noopener\">Here are further details on these regulations.<\/a><\/em><\/p>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Identifying the solution and checking the feasibility of the charging infrastructure project<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>If necessary, find an investor for the project\n<ul class=\"wp-block-list\">\n<li>Matchmaking tool for landowners and investors: <a href=\"https:\/\/pro-charging.lu\/\" data-type=\"URL\" data-id=\"https:\/\/pro-charging.lu\/\" target=\"_blank\" rel=\"noreferrer noopener\">pro-charging.lu<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>Verification of project feasibility<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Determining the capacity available from <a href=\"http:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/web.ilr.lu\/FR\/Particuliers\/Electricite\/Informations-utiles\/Les-acteurs-du-marche\/Pages\/default.aspx\" rel=\"noreferrer noopener\">the grid operator<\/a><\/li>\n\n\n\n<li>Examination of the existing electrical installation by a qualified professional (<a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Electricien&amp;searchKeywords=\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Electricien&amp;searchKeywords=\" rel=\"noreferrer noopener\">certified electrician<\/a>)<\/li>\n\n\n\n<li>Request quotes from qualified professionals (<a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Electricien&amp;searchKeywords=\" data-type=\"link\" data-id=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Electricien&amp;searchKeywords=\" target=\"_blank\" rel=\"noreferrer noopener\">certified electricians<\/a>) or developers of charging infrastructure projects<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Subsidy application<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\"><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/infrastr-vehic-electriques\/aide-infrastructures-charges-portees-pme.html\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/infrastr-vehic-electriques\/aide-infrastructures-charges-portees-pme.html\" rel=\"noreferrer noopener\">Aid for SMEs for investment in charging infrastructure<\/a><\/h4>\n\n\n\n<p>Small and medium-sized enterprises (SMEs) that carry out projects to deploy private charging infrastructure may benefit from investment aid for their economic activities. The maximum aid intensity per project is 40% for medium-sized enterprises and 50% for small enterprises, with an absolute ceiling of \u20ac100,000 per enterprise.<\/p>\n\n\n\n<p>For any questions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Support with preparing the aid application: <a href=\"mailto:aides@luxinnovation.lu\" target=\"_blank\" data-type=\"mailto\" data-id=\"mailto:aides@luxinnovation.lu\" rel=\"noreferrer noopener\">Luxinnovation<\/a><\/li>\n\n\n\n<li>Technical support for project development: <a href=\"mailto:entreprises@klima-agence.lu\" target=\"_blank\" data-type=\"mailto\" data-id=\"mailto:e-mobility@klima-agence.lu\" rel=\"noreferrer noopener\">Klima-Agence<\/a><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Call for projects<\/h4>\n\n\n\n<p>There is currently no open call for projects under the financial aid scheme for investments in charging infrastructure.<\/p>\n\n\n\n<p>The sixth call for projects, aimed at supporting the deployment of publicly accessible or private charging infrastructure, closed on 3 June 2025.<\/p>\n\n\n\n<p>Dates for future calls will be announced at a later stage.<\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>For any questions:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Support in preparing the aid application: <a href=\"mailto:aides@luxinnovation.lu\">Luxinnovation<\/a><\/li>\n\n\n\n<li>Support for project development at a technical level: <a href=\"mailto:entreprises@klima-agence.lu\">Klima-Agence<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Implementation of the project to install charging infrastructure for electric vehicles<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Submitting an installation request to <a href=\"http:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/web.ilr.lu\/FR\/Particuliers\/Electricite\/Informations-utiles\/Les-acteurs-du-marche\/Pages\/default.aspx\" rel=\"noreferrer noopener\">the grid operator<\/a><\/strong><br>Application required for any installation of a charging point with a power rating greater than or equal to 7 kW (10A) three-phase or greater than 4.6 kW single-phase (20A).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Carry out the work in accordance with technical requirements and standards<\/strong>\n<ul class=\"wp-block-list\">\n<li>Connection requirements &#8211; TAB \/ Low-voltage (LV) network: <a href=\"https:\/\/www.creos-net.lu\/en\/pro-space\/electricity\/connection\/tab\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.creos-net.lu\/index.php?id=140&amp;L=0\" rel=\"noreferrer noopener\">TAB BT<\/a><\/li>\n\n\n\n<li>Fire safety requirements (<a href=\"https:\/\/itm.public.lu\/dam-assets\/fr\/securite-sante\/conditions-types\/itm-cl-1100-2000\/ITM-SST-1506-3.pdf\" data-type=\"link\" data-id=\"https:\/\/itm.public.lu\/dam-assets\/fr\/securite-sante\/conditions-types\/itm-cl-1100-2000\/ITM-SST-1506-3.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">ITM-SST 1506.3<\/a>)<\/li>\n\n\n\n<li><a href=\"https:\/\/www.klima-agence.lu\/sites\/default\/files\/2022-08\/Fiche_Borne_Artisan_6P_NewBrand_EN.pdf\" data-type=\"link\" data-id=\"https:\/\/www.klima-agence.lu\/sites\/default\/files\/2022-08\/Fiche_Borne_Artisan_6P_NewBrand_FR.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Artisan\u2019s fact sheet<\/a> and <a href=\"https:\/\/www.klima-agence.lu\/sites\/default\/files\/2023-01\/_2022_Planungsgrundlagen_Ladeinfrastruktur_0.pdf\" data-type=\"link\" data-id=\"https:\/\/www.klima-agence.lu\/sites\/default\/files\/2023-01\/_2022_Planungsgrundlagen_Ladeinfrastruktur_0.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">planning guide<\/a>: charging infrastructure<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Compliance check by the network operator<\/strong>\n<ul class=\"wp-block-list\">\n<li>The company responsible for the work notifies the network operator that the work has been completed.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"featured_media":654,"parent":0,"template":"","secteur":[129,138,142,74,67,76,123,132,77,68,69,62,72,71,73],"thematique":[99],"application":[126],"class_list":["post-1591","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-boulanger-en","secteur-grocery-shop","secteur-food-trade","secteur-administration","secteur-horeca-en","secteur-agriculture-viticulture","secteur-butcher-craft-industry","secteur-carpentry","secteur-aid-and-care-sector","secteur-construction-en","secteur-commerce-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-mobility-and-transportation","application-electricity"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":31,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1591\/revisions"}],"predecessor-version":[{"id":1633628,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1591\/revisions\/1633628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media\/654"}],"wp:attachment":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media?parent=1591"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/secteur?post=1591"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/thematique?post=1591"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/application?post=1591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}