{"id":1431282,"date":"2025-07-09T08:49:47","date_gmt":"2025-07-09T06:49:47","guid":{"rendered":"https:\/\/dev.klimapaktfirbetriber.lu\/?post_type=mesures&#038;p=1431282"},"modified":"2025-10-21T15:52:47","modified_gmt":"2025-10-21T13:52:47","slug":"installation-of-a-battery-storage-system-in-your-company","status":"publish","type":"mesures","link":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/measures\/installation-of-a-battery-storage-system-in-your-company\/","title":{"rendered":"Installation of a battery storage system in your company"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Battery storage \u2013 a key lever in optimising your electricity consumption<\/h2>\n\n\n\n<p>As part of the decarbonisation process, electricity is playing an increasingly central role in businesses, gradually replacing other energy sources such as fossil fuels. It is therefore becoming increasingly more important for companies not only to control their electricity costs but also to optimise consumption and self-generation in order to maximise their energy potential \u2013 for example through the use of a photovoltaic system, and in some cases, in combination with a battery storage system.<\/p>\n\n\n\n<p>Commercial and industrial battery storage systems, with capacities ranging from 30\u202fkWh to several MWh, enable companies to increase the self-consumption of on-site renewable electricity generation and thus reduce energy costs. By reducing power peaks, they allow for improved peak load management and thereby significantly reduce a company\u2019s electricity bill. To fully leverage your battery\u2019s capacity and increase your profits it is equally essential to install an energy management system (EMS).<\/p>\n\n\n\n<p>The following measure outlines in which scenario the installation of a battery storage system is recommended and beneficial \u2013 and how its implementation can be planned.<\/p>\n\n\n\n<!--more-->\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Defining the needs<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1.1. Overview of potential applications for battery storage in commercial and industrial settings<\/h3>\n\n\n\n<p>A commercial or industrial battery storage system \u2013 especially when combined with a photovoltaic installation \u2013 can provide various operational advantages. Key application areas include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>optimised self-consumption<\/li>\n\n\n\n<li>peak shaving<\/li>\n\n\n\n<li>emergency power supply<\/li>\n\n\n\n<li>shared electricity use within an energy community<\/li>\n\n\n\n<li>dynamic tariffs (use of variable prices on the wholesale electricity market)<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-text-align-center wp-element-button\" href=\"https:\/\/www.klima-agence.lu\/en\/home-battery\" target=\"_blank\" rel=\"noreferrer noopener\">Discover the benefits of a solar battery<\/a><\/div>\n<\/div>\n\n\n\n<p>Furthermore, there are additional potential monetisation mechanisms that can generate additional revenue and increase return on investment \u2013 for example, through \u201carbitrage on the imbalance market\u201d or so-called \u201cancillary services\u201d. However, these opportunities are currently not available in Luxembourg, as they depend on the further development of the market and the regulatory framework, which is still being established.<\/p>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h4 class=\"wp-block-heading\">Optimise the use of your battery with an energy management system<\/h4>\n\n\n\n<p><strong>EMS (Energy Management System):<\/strong> To activate and optimise certain applications, battery storage systems must be equipped with a compatible energy management system (EMS). This device monitors, controls, and optimises the energy flow within a circuit located behind the grid connection point. This circuit includes the battery, the inverter and its photovoltaic system, charging stations for electric vehicles, and possibly a heat pump. All of these energy devices must be capable of communicating data and receiving commands, which makes it essential to ensure their compatibility.<\/p>\n<\/div><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">1.2. Analysis of typical consumption and production profiles of companies<\/h3>\n\n\n\n<p>Before investing in a battery storage system, it is important to understand the 15-minute consumption and production profiles in order to identify potential energy optimisation opportunities.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-style-default\"><img decoding=\"async\" width=\"1024\" height=\"519\" src=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/Graph_Autoconso_Entreprise_bis_EN-1024x519.png\" alt=\"\" class=\"wp-image-1431317\" title=\"Production et consommation d\u2019\u00e9lectricit\u00e9 solaire moyenne sur 24 heures dans une entreprise\" srcset=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/Graph_Autoconso_Entreprise_bis_EN-1024x519.png 1024w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/Graph_Autoconso_Entreprise_bis_EN-300x152.png 300w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/Graph_Autoconso_Entreprise_bis_EN-768x389.png 768w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/Graph_Autoconso_Entreprise_bis_EN-1536x778.png 1536w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/Graph_Autoconso_Entreprise_bis_EN-2048x1038.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><br><em>Average solar electricity production and consumption over 24 hours in a company<\/em><\/figcaption><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Identification of different energy profiles of companies<\/h4>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_6-1024x724.png\" alt=\"\" class=\"wp-image-1469252\" style=\"width:453px;height:auto\" srcset=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_6-1024x724.png 1024w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_6-300x212.png 300w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_6-768x543.png 768w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_6-1536x1086.png 1536w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_6-2048x1448.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Profile A<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<p><strong>Profile A: A company with solar production below its consumption<\/strong><\/p>\n\n\n\n<p>All produced energy is self-consumed, e.g., a government office or a store with limited roof space. <\/p>\n\n\n\n<p>\u27a1\ufe0f <strong>Conclusion<\/strong>: This profile is not suitable for the installation of a battery storage system.<\/p>\n\n\n\n<div style=\"height:1px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_5-1024x724.png\" alt=\"\" class=\"wp-image-1469268\" style=\"width:451px;height:auto\" srcset=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_5-1024x724.png 1024w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_5-300x212.png 300w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_5-768x543.png 768w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_5-1536x1086.png 1536w, https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_5-2048x1448.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Profile B<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<p><strong>Profile B: A company that produces more during the day than it consumes<\/strong><\/p>\n\n\n\n<p>Opportunity to store excess production and release it in the evening or at night when consumption rises again, e.g., a cafeteria.<\/p>\n\n\n\n<p>\u27a1\ufe0f <strong>Conclusion<\/strong>: This profile could, under certain conditions\u2014including a profitability calculation\u2014consider using a battery storage system to cover the energy consumed in the morning.<\/p>\n\n\n\n<p><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/dev.klimapaktfirbetriber.lu\/wp-content\/uploads\/2025\/07\/KLIMA0001_Graphique_EN_1-1-1024x724.png\" alt=\"\" class=\"wp-image-1469407\" style=\"width:456px;height:auto\"\/><figcaption class=\"wp-element-caption\"><em>Profile C<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<p><strong>Profile C: A company that produces more energy during the day than it consumes, with a fleet of electric vehicles that are in use during the day and need to be charged at night<\/strong><\/p>\n\n\n\n<p>For example, a transport company or a postal service provider.<\/p>\n\n\n\n<p>\u27a1\ufe0f<strong>Conclusion:<\/strong> This profile could, under certain conditions\u2014including a profitability calculation\u2014consider the use of a battery storage system to cover energy consumption during the night.<\/p>\n\n\n\n<p><\/p>\n\n\n<div class=\"lightweight-accordion bordered has-background\"><details><summary class=\"lightweight-accordion-title\" style=\"background:#EBF5F4;\"><span><strong>How do you obtain your consumption and production data?<\/strong><\/span><\/summary><div class=\"lightweight-accordion-body\" style=\"border-color:#EBF5F4;\">\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.leneda.lu\/en\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.leneda.lu\/en\/\" rel=\"noreferrer noopener\">Retrieve your 15-minute interval data from Leneda<\/a>, the national energy data platform.<\/li>\n\n\n\n<li>Ask your energy supplier.<\/li>\n<\/ul>\n\n<\/div><\/details><\/div>\n\n<div class=\"lightweight-accordion has-background\"><details><summary class=\"lightweight-accordion-title\" style=\"background:#EBF5F4;\"><span><strong>How to interpret your data?<\/strong><\/span><\/summary><div class=\"lightweight-accordion-body\" style=\"border-color:#EBF5F4;\">\n\n<ul class=\"wp-block-list\">\n<li>Consult an engineering firm or a specialised service provider.<\/li>\n<\/ul>\n\n<\/div><\/details><\/div>\n\n<div class=\"lightweight-accordion has-background\"><details><summary class=\"lightweight-accordion-title\" style=\"background:#EBF5F4;\"><span><strong>Inform yourself about the type of electricity contract your company has concluded:<\/strong><\/span><\/summary><div class=\"lightweight-accordion-body\" style=\"border-color:#EBF5F4;\">\n\n<ul class=\"wp-block-list\">\n<li>Low voltage or medium voltage contract?<\/li>\n\n\n\n<li>Fixed contract, variable contract, or dynamic tariff?<\/li>\n<\/ul>\n\n<\/div><\/details><\/div>\n\n<div class=\"lightweight-accordion has-background\"><details><summary class=\"lightweight-accordion-title\" style=\"background:#EBF5F4;\"><span><strong>Define your future energy potential or future electricity demand:<\/strong><\/span><\/summary><div class=\"lightweight-accordion-body\" style=\"border-color:#EBF5F4;\">\n\n<ul class=\"wp-block-list\">\n<li>Possibility to expand your photovoltaic system?<\/li>\n\n\n\n<li>Planning future electricity consumption:\n<ul class=\"wp-block-list\">\n<li>electrification of your vehicle fleet \u27a1\ufe0f <a href=\"https:\/\/dev.klimapaktfirbetriber.lu\/en\/measures\/charging-infrastructure-for-ev-on-company-premises\/\">Installation of charging infrastructure at the company.<\/a><\/li>\n\n\n\n<li>replacement of the heating boiler with a heat pump.<\/li>\n\n\n\n<li>others.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<\/div><\/details><\/div>\n\n\n<h3 class=\"wp-block-heading\">1.3. Is investing in a battery storage system economically interesting for my company?<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">In which cases can investing in a battery storage system be profitable for my company<\/h4>\n\n\n\n<p>A battery is resource-intensive and remains a considerable investment, even with available subsidies. It is therefore important to consider various parameters to determine when such an installation is economically viable. Profitability increases if the following parameters are met:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Proper sizing of the battery<\/li>\n\n\n\n<li>High electricity prices<\/li>\n\n\n\n<li>Low feed-in tariff<\/li>\n\n\n\n<li>Competitive battery pricef.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>How to size the battery storage system?<\/strong><\/h4>\n\n\n\n<p>Battery sizing is a critical factor in profitability calculations. Consult a qualified electrician or an engineering firm to professionally determine the battery size suitable for your current and future energy profile.<\/p>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h4 class=\"wp-block-heading\">Making the best choice for your company\u2019s energy consumption<\/h4>\n\n\n\n<p>A precise understanding of the consumption and production profile is crucial to correctly size the battery and, above all, to assess whether the investment is economically viable. Conscious and sensible energy consumption also enables savings through feeding excess energy back into the grid and through energy-saving behaviours. Depending on your energy profile, investing in a battery storage system is not necessarily the best solution. <a href=\"https:\/\/dev.klimapaktfirbetriber.lu\/en\/measures\/autoconsommation-et-partage-delectricite\/\" target=\"_blank\" rel=\"noreferrer noopener\">Discover the measure on electricity sharing.<\/a><\/p>\n<\/div><\/div>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Electricity consumption: identifying the most suitable solution and the feasibility of the battery storage installation project<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Request for a feasibility study<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Compliance of the existing electrical installation<\/li>\n\n\n\n<li>Availability of necessary space<\/li>\n\n\n\n<li>Compatibility with existing photovoltaic systems (inverters)<\/li>\n\n\n\n<li>Compatibility with an energy management system (EMS)<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Inquiry with various providers<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Grid operator for battery connection (in case of feed-in)<\/li>\n\n\n\n<li>Service provider\/electrician who will install the battery<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Calculation of investment profitability<\/h3>\n\n\n\n<p>Calculation of investment profitability<br>When calculating profitability, it is important to consider not only the technical feasibility of the project but also the economic feasibility, taking into account the following parameters:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>guaranteed battery lifespan (&gt; 10 years)<\/li>\n\n\n\n<li>number of guaranteed charge\/discharge cycles (&gt; 5,000 cycles)<\/li>\n<\/ul>\n\n\n\n<p>Generally, for industrial-scale battery storage, local usage alone, i.e., self-consumption and peak load shaving, yields a return on investment in the yield of about 8 to 12 years.<\/p>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Identify electricity storage applications relevant to your company&#8217;s situation<\/strong><\/p>\n\n\n\n<p>A combination of different applications can significantly increase the profitability for the company. For example, by using the battery storage which is helping to increase self-consumption of solar energy in summer to engage in energy arbitrage in winter. We strongly recommend hiring an engineering firm to identify possible applications specific to your case and to assess the feasibility and profitability of the project.<\/p>\n<\/div><\/div>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Subsidy application<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Government subsides<\/h3>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Please note: any application for government or non-government subsidies must comply with the \u201cincentive effect\u201d, subject to compliance with the subsidy conditions.<\/strong><br>In order to respect the \u201cincentive effect\u201d, no binding commitment (signing a quotation; paying a deposit) may be made BEFORE having received the agreement in principle from the State or the electricity and natural gas supplier following an application for subsidy.<\/p>\n<\/div><\/div>\n\n\n\n<p>In the absence of a dedicated state subsidy for the installation of a storage battery, there are two types of subsidies available for storage batteries: those in combination with the installation of a photovoltaic system, and tax incentives.<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/aides.klima-agence.lu\/details\/522?lng=en\" target=\"_blank\" rel=\"noreferrer noopener\">Klimabonus:<\/a> Battery (\u2264 30 kWh) + PV<\/strong><br>Investment aid of 50% for the installation of storage batteries combined with a photovoltaic installation operated in \u201cself-consumption mode\u201d without a guaranteed feed-in tariff. The storage system is subsidised if the building is not used for residential purposes and the storage capacity is \u2264 1\u202fkWh\/kWp. In this case, the feed-in tariff is not guaranteed, and a purchase agreement for any surplus electricity must be concluded with a provider.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>For questions: <a href=\"mailto:entreprises@klima-agence.lu\">Klima-Agence<\/a><\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/energie\/production-energie\/production-electricite-energies-renouvelables.html\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Call for projects for the development and operation of agrivoltaic power plants: Battery + PV<\/strong><\/a><br>Storage batteries are an integral part of the plant. The principle of the call for projects is as follows: selected projects benefit from a market premium contract for the injection of the electricity produced, valid for 15 years. Please note that buildings and ineligible surfaces are excluded.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Consult the practical terms on <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/energie\/production-energie\/production-electricite-energies-renouvelables.html\" target=\"_blank\" rel=\"noreferrer noopener\">guichet.lu<\/a>.<br>The project specifications are available upon request via the following email address: <a href=\"mailto:PV@energie.etat.lu\">PV@energie.etat.lu<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Call for tenders for operating subsidies for large-scale photovoltaic power plants<\/strong><\/p>\n\n\n\n<p>The operating subsidy allows, in principle, companies to enter into a market premium contract over a 15-year period, during which they will be remunerated based on the electricity produced and fed into the grid.<\/p>\n\n\n\n<p>The seventh call for tenders for operating subsidies offers a total capacity of 45 MW to be awarded, divided into four lots with maximum prices ranging from \u20ac85\/MWh to \u20ac195\/MWh.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Deadline: 28 November 2025 (12:00 CET)<br>Practical details are available on <a href=\"https:\/\/guichet.public.lu\/fr\/entreprises\/financement-aides\/aides-environnement\/appel-projets-photovoltaique\/appel-photovoltaique-aides-investissements.html\" target=\"_blank\" rel=\"noopener\">guichet.lu<\/a>.<br>The specifications can be requested at: <a href=\"mailto:PV@eco.etat.lu\">PV@eco.etat.lu<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/fiscalite\/bonification-impot-investissement\/bonification-transition-ecologique-energetique.html\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Tax incentive for investment in an ecological and energy transition project: Battery with or without PV in self-consumption mode<\/strong><\/a><br>The tax incentive is calculated based on investments and operating expenses incurred as part of an ecological and energy transition project. The tax credit rate is 18% for investments and operating expenses, except for depreciable tangible assets, which benefit from a rate of 6%. <br>Project eligibility is subject to two conditions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The stored energy must be produced from non-fossil renewable sources.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The energy must be used for self-consumption.<\/li>\n<\/ul>\n\n\n\n<p>For questions: <a href=\"mailto:bonification@eco.etat.lu\">Ministry of the Economy \u2013 Bonification<\/a><\/p>\n\n\n\n<p class=\"has-light-green-background-color has-background\">N.B. Les aides \u00e9tatiques ne sont pas cumulables entre elles pour un m\u00eame projet.<\/p>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Request for permits for the installation of an electricity storage battery<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Request approval from the grid operator for the connection of a battery storage system.<\/li>\n\n\n\n<li>Request an operating permit for classified facilities subject to the nomenclature.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Execution of the Battery Storage Installation<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Carry out the work in accordance with technical and regulatory requirements<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Connection regulations \u2013 TAB \/ Low voltage network (LV) <a href=\"https:\/\/www.creos-net.lu\/en\/pro-space\/electricity\/connection\/tab\" target=\"_blank\" rel=\"noreferrer noopener\">TAB BT.<\/a><\/li>\n\n\n\n<li>Connection regulations \u2013 TAB \/ Medium voltage network (MV) <a href=\"https:\/\/www.creos-net.lu\/en\/pro-space\/electricity\/connection\/tab\" target=\"_blank\" rel=\"noreferrer noopener\">TAB MT.<\/a><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">After the installation<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Compliance check by the grid operator (GO). The completion of the work must be reported to the grid operator by the company responsible for the installation.<\/li>\n\n\n\n<li>Acceptance of the installation by an authorised inspection body.<\/li>\n\n\n\n<li>Notification of your installation to your insurer.<\/li>\n<\/ul>\n","protected":false},"featured_media":1429731,"parent":0,"template":"","secteur":[129,138,142,74,67,76,123,132,77,68,69,62,72,71,73],"thematique":[78],"application":[103,126],"class_list":["post-1431282","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-boulanger-en","secteur-grocery-shop","secteur-food-trade","secteur-administration","secteur-horeca-en","secteur-agriculture-viticulture","secteur-butcher-craft-industry","secteur-carpentry","secteur-aid-and-care-sector","secteur-construction-en","secteur-commerce-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-energie-en","application-building","application-electricity"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1431282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":14,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1431282\/revisions"}],"predecessor-version":[{"id":2041915,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1431282\/revisions\/2041915"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media\/1429731"}],"wp:attachment":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media?parent=1431282"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/secteur?post=1431282"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/thematique?post=1431282"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/application?post=1431282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}