{"id":1424,"date":"2023-06-06T17:14:54","date_gmt":"2023-06-06T15:14:54","guid":{"rendered":"https:\/\/dev.klimapaktfirbetriber.lu\/mesures\/installation-dune-nouvelle-unite-de-production-de-chaleur-en-entreprise\/"},"modified":"2025-06-30T09:52:04","modified_gmt":"2025-06-30T07:52:04","slug":"installing-a-new-heat-production-unit-in-a-company","status":"publish","type":"mesures","link":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/measures\/installing-a-new-heat-production-unit-in-a-company\/","title":{"rendered":"Installing a new heat production unit in a company"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">The heating installation: an important leverage point in the energy transition<\/h2>\n\n\n\n<p>The heat production unit is a major leverage point for a successful energy transition. As its primary purpose is to supply heat for comfort and operational needs, the heating system must be scaled to provide the temperature levels and necessary quantities to keep the business running. Nowadays, there are heat production systems that are adapted to each temperature level are flexible in terms of power and are environmentally friendly.<\/p>\n\n\n\n<!--more-->\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Definition of the company&#8217;s heating requirements<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Analysis of the current situation<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Determine the different parameters of the current installation, e.g. age, general condition, temperature level, consumption and associated costs, etc.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Needs assessment by a qualified tradesman (<a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Installateur%2BChauffage%2BSanitaire-Frigoriste-Ventilation&amp;searchKeywords=\" target=\"_blank\" rel=\"noopener\">heating installer<\/a>) or by an consulting <a href=\"https:\/\/www.oai.lu\/fr\/9\/topmenu\/annuaire-membres\/\" target=\"_blank\" rel=\"noopener\">engineering office<\/a><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Analysis of general heating requirements in accordance with DIN EN 12831.<\/li>\n\n\n\n<li>Analysis of the power required by heat-consuming appliances<\/li>\n\n\n\n<li>Analysis and reassessment of the temperature levels required for the various applications.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Identification of the solution and verification of the feasibility of the heating installation project<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Definition of the solution<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Based on the needs analysis, a solution is defined in collaboration with a supplier, a <a href=\"https:\/\/www.oai.lu\/fr\/9\/topmenu\/annuaire-membres\/\" target=\"_blank\" rel=\"noreferrer noopener\">consulting engineering office<\/a> or with a <a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Installateur%2BChauffage%2BSanitaire-Frigoriste-Ventilation&amp;searchKeywords=\" target=\"_blank\" rel=\"noreferrer noopener\">qualified professional (heating installer)<\/a>.<\/li>\n\n\n\n<li>In addition to the main heat production unit, recovering waste heat and the unit with solar thermal heating must also be taken into consideration.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Verification of the proposed heating installation regarding <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/urbanisme-environnement\/commodo-incommodo\/autorisations-commodo\/commodo.html\" target=\"_blank\" rel=\"noopener\">operating permits<\/a><\/h4>\n\n\n\n<p>When adapting existing installations and particularly when setting up new installations, check the nomenclature of classified establishments.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Drawing up specifications and requesting tenders for the heating system project<\/h4>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Subsidy application<\/h3>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Please note: any application for government or non-government subsidies must comply with the &#8220;incentive effect&#8221;, subject to compliance with the subsidy conditions.<\/strong><\/p>\n\n\n\n<p>To respect the \u201cincentive effect\u201d, no binding commitment (cost estimation signed; payed a deposit) can be made BEFORE having received the tentative settlement from the State or the electricity and natural gas supplier following an assistance request.<\/p>\n<\/div><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Government subsidies<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4\/fit-4-sustainability\/fit-4-sustainability.html\" target=\"_blank\" rel=\"noreferrer noopener\">\u201cFit 4 Sustainability&#8221; programme<\/a><\/strong>\n<ul class=\"wp-block-list\">\n<li>The Fit 4 Sustainability programme co-finances an environmental audit + action plan on one or more of the topics selected by the company (energy, greenhouse gases, waste, water, etc.).<\/li>\n\n\n\n<li>Assistance of up to 50%, 60% and 70% of the fees for carrying out an environmental study (energy audit and\/or carbon assessment) + detailed, costed action plan to reduce consumption\/GHGs (medium- and long-term investment, ROI, etc.) &#8211; open to SMEs and large companies (except those required to carry out a statutory audit).<\/li>\n\n\n\n<li>For questions : <a href=\"mailto:fit4sustainability@luxinnovation.lu\" target=\"_blank\" data-type=\"mailto\" data-id=\"mailto:fit4sustainability@luxinnovation.lu\" rel=\"noreferrer noopener\">Luxinnovation<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-sme-packages\/soutien-pme\/sme-packages-sustainability.html\" target=\"_blank\" rel=\"noreferrer noopener nofollow\"><span lang=\"en\">SME Packages &#8211; Sustainability<\/span><\/a><\/strong> \n<ul class=\"wp-block-list\">\n<li>Financial Aid for small and medium-sized enterprises covering up to 70% of eligible costs for the implementation of a project aimed at reducing the environmental impact. The eligible project budget must be in a range from 3.000 \u20ac to 25.000 \u20ac excl. VAT.<\/li>\n\n\n\n<li>For more information:\n<ul class=\"wp-block-list\">\n<li><a href=\"mailto:ehandwierk@cdm.lu\" target=\"_blank\" rel=\"noreferrer noopener\">Chambre des M\u00e9tiers<\/a> for craft companies<\/li>\n\n\n\n<li><a href=\"mailto:sustainability@cc.lu\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Chamber of Commerce<\/a><span style=\"color: initial;\"> <\/span>for businesses in the non-crafts sectors<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>SME scheme &#8211; <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-pme\/aides-generales-pme\/aide-service-conseil.html\" target=\"_blank\" rel=\"noreferrer noopener\">Subsidies for consultancy services<\/a><\/strong>\n<ul class=\"wp-block-list\">\n<li>Support for small and medium-sized businesses, up to 50% of external consultancy fees<\/li>\n\n\n\n<li>Examination of project eligibility and organisation granting the subsidy: <a href=\"mailto:info.aide.pme@eco.etat.lu\">Ministry of the Economy<\/a>&nbsp;(Department for Support to SMEs).<\/li>\n\n\n\n<li>For further information:\n<ul class=\"wp-block-list\">\n<li><a href=\"mailto:subsides@houseofentrepreneurship.lu\" target=\"_blank\" data-type=\"mailto\" data-id=\"mailto:subsides@houseofentrepreneurship.lu\" rel=\"noreferrer noopener\">House of Entrepreneurship<\/a> of the Chamber of Commerce<\/li>\n\n\n\n<li><a href=\"mailto:ehandwierk@cdm.lu\" target=\"_blank\" data-type=\"mailto\" data-id=\"mailto:ehandwierk@cdm.lu\" rel=\"noreferrer noopener\">Chambre des M\u00e9tiers<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Environmental protection scheme<\/strong> &#8211; <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/aides-environnement\/industrie-services\/aide-protec-environnement.html\" target=\"_blank\" rel=\"noreferrer noopener\">Investment subsidies for environmental protection<\/a>\n<ul class=\"wp-block-list\">\n<li>Examination of company eligibility and costs: <a href=\"https:\/\/guichet.public.lu\/en\/citoyens\/organismes\/organismes_entreprises\/ministere-economie\/direction-recherche-innov.html\" target=\"_blank\" rel=\"noopener\">General Directorate \u2013 Industry, New Technologies, and Research<\/a><\/li>\n\n\n\n<li>Support in drawing up the subsidy application file before the submission to the Ministry of the Economy<\/li>\n\n\n\n<li>For further information: Luxinnovation<\/li>\n\n\n\n<li>More information and assistance for businesses on environmental investment is available in the <a href=\"https:\/\/luxinnovation.lu\/getmedia\/ef53005c-714b-47fe-9e93-4ded9ec74387\/guide-env-simplifie-meco-lxi-20221020-(2).pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Simplified Guide for Businesses (FR).<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\"><strong>N.B. Government subsidies cannot be accumulated for the same project.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Application for subsidies from electricity and natural gas suppliers<\/h4>\n\n\n\n<p>As of 2015, natural gas and electricity suppliers are obliged under the Commitment Mechanism to generate some energy savings among their consumers. Since then, energy suppliers have been offering monitoring and advisory services as well as subsidy programmes for consumers to implement energy efficiency measures.<\/p>\n\n\n\n<p><strong>The providers offering this service to companies are as follows:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.enoprimes.lu\/fr\/entreprises\/\" target=\"_blank\" rel=\"noreferrer noopener\">Enoprimes<\/a> Enovos + SUDenergie<\/li>\n\n\n\n<li><a href=\"https:\/\/sudenergie.lu\/en\/service\/save-energy\" target=\"_blank\" rel=\"noreferrer noopener\">SUDenergie<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.sudstroum.lu\/en\/customer-services\/advice-financial-assistance\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sudstroum<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\">It should be noted that the subsidies from suppliers can be accumulated with any state subsidies for the same project.<\/p>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>After the heating installation has been carried out<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Inspection of the installation by a representative of the Chambre des M\u00e9tiers<\/strong>\n<ul class=\"wp-block-list\">\n<li>Approval of any new heating installation using diesel, solid fuel or gas by the SCRB Department of the <a href=\"https:\/\/www.cdm.lu\/scrb\/controle-des-installations-du-batiment-particuliers\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.cdm.lu\/scrb\/controle-des-installations-du-batiment-particuliers\" rel=\"noreferrer noopener\">Chambre des M\u00e9tiers<\/a> mendatory.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Scheduling of regular maintenance and inspection of the installation<\/strong>.<\/li>\n<\/ul>\n","protected":false},"featured_media":752,"parent":0,"template":"","secteur":[129,138,74,76,123,77,132,68,69,62,72,71,73],"thematique":[78],"application":[104],"class_list":["post-1424","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-boulanger-en","secteur-grocery-shop","secteur-administration","secteur-agriculture-viticulture","secteur-butcher-craft-industry","secteur-aid-and-care-sector","secteur-carpentry","secteur-construction-en","secteur-commerce-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-energie-en","application-heating"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":27,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1424\/revisions"}],"predecessor-version":[{"id":1387090,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1424\/revisions\/1387090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media\/752"}],"wp:attachment":[{"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media?parent=1424"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/secteur?post=1424"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/thematique?post=1424"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/dev.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/application?post=1424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}